The remodel for Building 908 included a total interior renovation of the first and second floor offices. Halo’s work included installation of metal stud framing, elevator shaft wall, insulation, drywall, tape and finish, and painting. Halo was also tasked with door and hardware installation, fire caulking, and acoustical ceilings.

Previous
Previous

Bldg 898

Next
Next

Madabolic