Bldg 333 is one building of a two building remodel. The remodel for building 333 included building a curtain wall around the full exterior of the building. This was achieved via design of a third party engineer hired by Halo to provide the calculations and drawings for the wall’s exterior. Other work included interior framing, insulation, drywall installation, acoustical ceilings, tape and finish, and finally painting of the interior of the building as well as some exterior miscellaneous metal.